CEE Interview and Written Switching Procedure Experience

SLD for the written switching procedure 

Black colour is what I wrote
Red colour is the correction or further explanation.

Job Sheet: To perform maintenance at Ring Main Unit (2 + 1) at Pencawang Elektrik Kg Jelutong
(RMU 2+1 means 2 feeder and 1 Tx)

Preparation at all substations
1. Wear complete arc flash PPE
2. Note any alarms, trips and conditions of switch gears
3. Ensure rubber mat is available at all time
4. Ensure that HT voltage stick and multimeter are in good working condition.
• the steps above are done at each substation prior to commencing of switching work,

P/E Kg Jelutong
1. Inform OIC
2. At FA NOP
A. Perform voltage measurement at bus bar
a. Must state I.e. measured voltage is at 230VAC ph-n and 400VAC ph-ph within 10%, -6% tolerance for both bus bar and cable 
B. Perform voltage measurement at cable
C. Perform phase rotation check at bus bar
a. Clockwise rotation for both bus bar and cable 
D. Perform phase rotation check at cable
E. Perform phasing check between bus bar and cable
a. 0 VAC for in phase and 400VAC for out of phase

Tuesday, June 19, 2018

How important is synchronizing?

Synchronizing requirements
There are four conditions that need to be met when synchronizing a generator or generators to the grid, which are:
  • Voltage - Voltage magnitude of the Bus and Line must be the same or within the allowable magnitude set in the synchronizing check relay. Typical settings are at 5% up to 10%.
  • Frequency - Frequency must be the same or within the allowable slip frequency between the Bus (Generator) and the Line (Grid).
  • Phase Sequence - Phase sequence must be the same sequence i.e. R, Y, B sequence for both Bus and Line.
  • Phase Angle - Phase angle for each Bus and Line must be 120 deg apart respectively. The phase angle between e.g. R - Y of Line and R-Y of Bus must be within the maximum allowable angle difference. Typical settings are from 5 deg up to 15 deg. The charge man or competent electrical engineer would normally close the breaker when the synchroscope is close to 000 hrs, which means that the angle difference is closing to 0 deg.

Tuesday, June 5, 2018

Electrical Notes (Own)

Peace be upon all of you,

Here are some of my own electrical notes. It's hand written like a logbook. Hope it can help you to prepare for the Board of Engineers Malaysia PCE Technical Paper (Electrical) or just for the sake of increasing your knowledge. 

If you have any comments or questions about it, do comment below or send an email to cruxofee@gmail.com 

Here's the download link: 

Both files have the same content. I'd suggest for you to print on A3 paper as it will be legible. You can still zoom in and the writings are still legible. The high resolution is better and brighter.



Wednesday, December 6, 2017

PCE 2017 Day 2 Paper 1 (Electrical) Q7 SC Calculation

Q7. Calculation of fault current… What is the prospective short circuit current  at the end of a 100m, 70mm2, 4C cable connected to a secondary of a 1500 kVa Transformer, 11/0.4 kV, 5.65% Z. The cable reactance is 0.0751 ohm/km and the resistance is 0.3342 ohm/km. The Utility SC level is 50kA at the primary side of the transformer.

1. Answer 1 (Based on IEC 60909 definition for PSCC)

So what is prospective short circuit current? (IEC 60909)
1.3.3 Prospective (available) short-circuit current
Current that would flow if the short circuit were replaced by an ideal connection of negligible
impedance without any change of the supply


This is one KBAT question for Malaysian Professional Electrical Engineers.

The calculation below is to ultimately calculate the peak current or making current, most websites define the prospective short circuit current as the peak current. However, those definitions kind of differ from the IEC 60909 definition for PSCC.

Friday, November 24, 2017

PCE Related Acts and Regulations

Peace be upon all of you

Based on the syllabus for the Professional Competency Examination and Electrical Discipline, these are most of the acts and regulations mentioned, especially in preparation for the Common  Paper 1. 


Info on allowance to bring in printed and binded books.

Here are the links to the docs from related government websites. I pray and wish all the best of luck to all the candidates sitting for PCE this coming 29th and 30th November 2017.

Monday, November 20, 2017

Economy Resistor in Vacuum Contactor Unit

1. What is economy resistor?
A resistor placed in series with the DC closing coil of the VCU or other type of DC coil to limit the current to the closing coil during running. Used with DC contractors category DC-14.


2. Operation example of a TAMCO 3.3kV VCU
- RL-2 and RL-3 closes when RL relay energized.
- CC energized via CC (NC) contact
- CC (NC) opens and CC is energized via RES resistor (economy resistor) to limit the current.
 

AD

Disclaimer

The views expressed at, or through this site are those of individual authors writing in their individual capacities and professional experiences only. All liability with respect to actions taken or not taken based on the contents of this site are hereby expressly disclaimed. The content on this posting is provided "as-is", no representations are made that the content is error-free.

About Me

My photo
Kerteh, Terengganu, Malaysia
Electrical engineering Services and Training, Electrical engineering fundamental, Professional journey of an electrical engineer in Malaysia, Electrical technical sharing and tutorial, Simple electrical programs and calculators; Electrical Design, Maintenance and Testing. Electrical engineering services, training and consultancy in industrial as well as oil & gas sector. CoEE website also serves as a platform for electrical technical sharing, and engineering professional advancement in Malaysia